ST 12 ASHBURNHM ST over WATER PHILLIPS BROOK

1.2 MI N OF FITCH. C.L. · County 027, Massachusetts · Built 2020 · 2 Lanes · 3,438 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
W28017B1EDOTNBI
Year Built
2020
Length
25 m (82 ft)
Max Span
23.7 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
3,438
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.