ST 31 PRINCETON RD over WATER WHITMANS RIVER

1.0 MI N OF ST 2 · County 027, Massachusetts · Built 1929 · 2 Lanes · 6,854 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
F0400120PDOTNBI
Year Built
1929
Length
12.2 m (40 ft)
Max Span
10.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
6,854
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,005,000
Total Project Cost
$1,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.