ST 2 over WATER SAWMILL POND

.2 MILES EAST OF ST. 31 · County 027, Massachusetts · Built 1946 · 5 Lanes · 55,358 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
F040411P8DOTNBI
Year Built
1946
Length
10.2 m (33.5 ft)
Max Span
8.8 m
Width
29.8 m (97.8 ft)
Lanes
5
Daily Traffic
55,358
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,129,000
Total Project Cost
$3,194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.