ST 31 PRINCETON RD over ST 2
MM94.5 / EXIT 95 · County 027, Massachusetts · Built 1984 · 2 Lanes · 6,854 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
42.549708, -71.847194
This bridge is in worse condition than 92.7% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 42 years old.
Nearby Bridges
ST 31 PRINCETON RD over WATER WYMAN BROOK
Built 1984
ST 2 over WATER WYMAN BROOK
Built 1947
ST 2 over WATER SAWMILL POND
Built 1946
ST 2 ON RAMP H over WATER WYMAN BROOK
Built 1984
HWY 5TH MASS TPK over WATER FLAG BROOK
Built 2006
ST 31 PRINCETON RD over WATER WHITMANS RIVER
Built 1929
HWY DEPOT RD over ST 2
Built 1985
HWY ARBOR WAY over WATER BROOK
Built 1998
ST 2 A/STATE RD E over WATER WHITMAN RIVER
Built 1992
HWY DEPOT RD over WATER ROUND MEADOW BROOK
Built 2010
Bridge Details
- Structure #
- F040711KVDOTNBI
- Year Built
- 1984
- Length
- 42.7 m (140.1 ft)
- Max Span
- 20.7 m
- Width
- 20.3 m (66.6 ft)
- Lanes
- 2
- Daily Traffic
- 6,854
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,667,000
- Total Project Cost
- $8,501,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.