HWY DEPOT ST over WATER N NASHUA RIVER

AT JCT OF RTE 2A · County 027, Massachusetts · Built 1908 · 2 Lanes · 3,800 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F040041EHMUNNBI
Year Built
1908
Length
21.3 m (69.9 ft)
Max Span
21.3 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
3,800
Material
Masonry
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$995,000
Total Project Cost
$1,493,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.