HWY DANIELS ST over WATER N NASHUA RIVER

AT ROTARY OF 12 AND 2A · County 027, Massachusetts · Built 1906 · 2 Lanes · 9,922 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
F040061EJMUNNBI
Year Built
1906
Reconstructed
1989
Length
27.4 m (89.9 ft)
Max Span
12.8 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
9,922
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,945,000
Total Project Cost
$4,418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.