HWY MIDDLEFLD RD over WATER COLES BROOK

.5 MI E OF JOHNSON HILL R · County 003, Massachusetts · Built 2021 · 2 Lanes · 120 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
W09020C2WMUNNBI
Year Built
2021
Length
9.2 m (30.2 ft)
Max Span
9.2 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
120
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.