ST 8 S WSHGTN ST over WATER SHAKER MILL BROOK

0.1 MI N OF MAIN ST · County 003, Massachusetts · Built 1922 · 2 Lanes · 1,739 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
B030250BDDOTNBI
Year Built
1922
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,739
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,216,000
Total Project Cost
$3,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.