ST 8 MAIN ST over WATER YOKUM POND BROOK

@ CARTER RD. INTERSECTION · County 003, Massachusetts · Built 2006 · 2 Lanes · 2,180 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B030238VGDOTNBI
Year Built
2006
Length
14.6 m (47.9 ft)
Max Span
13.3 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
2,180
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$795,000
Total Project Cost
$1,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.