ST 8 MAIN ST over WATER YOKUM BROOK

.2 MI SOUTH OF HIGH ST · County 003, Massachusetts · Built 1922 · 2 Lanes · 1,552 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B030240BCDOTNBI
Year Built
1922
Length
9 m (29.5 ft)
Max Span
7.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,552
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$695,000
Total Project Cost
$1,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.