I 95 /ST128 over RR MBTA/BMRR

1.2 MI NELY RT 28 · County 017, Massachusetts · Built 1950 · 7 Lanes · 144,478 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W010192FGDOTNBI
Year Built
1950
Reconstructed
1959
Length
19.8 m (65 ft)
Max Span
17.7 m
Width
46.1 m (151.2 ft)
Lanes
7
Daily Traffic
144,478
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,986,000
Total Project Cost
$8,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.