I 95 /ST128 over RR MBTA/BMRR
1.2 MI NELY RT 28 · County 017, Massachusetts · Built 1950 · 7 Lanes · 144,478 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.51445, -71.090533
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 76 years old.
Nearby Bridges
I 95 /ST128 over HWY NORTH AVE
Built 1950
I 95 /ST128 over HWY PARKER RD
Built 1959
HWY HOPKINS ST over I 95 /ST128
Built 1959
I 95 /ST128 over ST129 EB LOWELL ST
Built 1949
I 95 /ST128 over ST129 WB MAIN ST
Built 1949
I 95 /ST128 over ST 28 MAIN ST
Built 1950
I 95 /ST128 over HWY MAIN ST
Built 1948
HWY MINERAL ST over RR MBTA/BMRR
Built 1997
I 93 over I 95 /ST128
Built 1957
I 93 over HWY WEST ST
Built 1959
Bridge Details
- Structure #
- W010192FGDOTNBI
- Year Built
- 1950
- Reconstructed
- 1959
- Length
- 19.8 m (65 ft)
- Max Span
- 17.7 m
- Width
- 46.1 m (151.2 ft)
- Lanes
- 7
- Daily Traffic
- 144,478
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,986,000
- Total Project Cost
- $8,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.