I 95 /ST128 over HWY MAIN ST

1 MI SW CHESTNUT & MAIN · County 009, Massachusetts · Built 1948 · 8 Lanes · 143,473 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L190112FDDOTNBI
Year Built
1948
Reconstructed
1959
Length
15.2 m (49.9 ft)
Max Span
15.2 m
Width
54.4 m (178.5 ft)
Lanes
8
Daily Traffic
143,473
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,131,000
Total Project Cost
$1,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.