I 95 SB/ST128 SB over HWY WALNUT ST

2.3 KM S US1 · County 009, Massachusetts · Built 1940 · 4 Lanes · 68,900 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L190042W5DOTNBI
Year Built
1940
Reconstructed
1960
Length
18.8 m (61.7 ft)
Max Span
15.2 m
Width
20.5 m (67.3 ft)
Lanes
4
Daily Traffic
68,900
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$948,000
Total Project Cost
$1,423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.