I 95 NB/ST128 NB over HWY SUMMER ST

0.5 MI S OF US-1 · County 009, Massachusetts · Built 1940 · 3 Lanes · 55,400 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L190072W6DOTNBI
Year Built
1940
Reconstructed
1960
Length
18.3 m (60 ft)
Max Span
15.2 m
Width
20.5 m (67.3 ft)
Lanes
3
Daily Traffic
55,400
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,529,000
Total Project Cost
$3,794,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.