I 95 RAMP G over I 95 RAMP F

.1 MI E US1 · County 009, Massachusetts · Built 1959 · 1 Lanes · 31,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
P030242VPDOTNBI
Year Built
1959
Reconstructed
2009
Length
19.8 m (65 ft)
Max Span
18.6 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
31,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,652,000
Total Project Cost
$2,479,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.