I 95 RAMP G over ST128

.7 MI S FOREST STREET · County 009, Massachusetts · Built 1988 · 3 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P030482W1DOTNBI
Year Built
1988
Length
83.5 m (274 ft)
Max Span
42.1 m
Width
13.9 m (45.6 ft)
Lanes
3
Daily Traffic
7,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,199,000
Total Project Cost
$10,799,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.