US 1 CONN RPS A&B over I 95 /ST 128

.2 MI E OF US-1 · County 009, Massachusetts · Built 1959 · 4 Lanes · 34,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
P030232VNDOTNBI
Year Built
1959
Reconstructed
2008
Length
74.1 m (243.1 ft)
Max Span
26.2 m
Width
23.5 m (77.1 ft)
Lanes
4
Daily Traffic
34,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,443,000
Total Project Cost
$17,165,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.