ST 2 WB over ST 2 A/PATRIOTS RD

MM 80.5 ON ST 2 WB · County 027, Massachusetts · Built 1969 · 2 Lanes · 11,196 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
T0202219KDOTNBI
Year Built
1969
Length
30.2 m (99.1 ft)
Max Span
28.8 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
11,196
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,778,000
Total Project Cost
$4,168,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.