HWY HIGHLAND AVE over US202 /ST2

MM 77.9 ON US202/ST2 · County 027, Massachusetts · Built 1959 · 2 Lanes · 905 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P090051AFDOTNBI
Year Built
1959
Reconstructed
2011
Length
41 m (134.5 ft)
Max Span
17.9 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
905
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,163,000
Total Project Cost
$4,745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.