ST 2 WB over US202 /ST2 A

MM 79.0 ON ST 2 WB · County 027, Massachusetts · Built 1969 · 2 Lanes · 16,422 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P09006199DOTNBI
Year Built
1969
Length
32.7 m (107.3 ft)
Max Span
30.7 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
16,422
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$103,000
Total Project Cost
$155,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.