HWY BLDWNVLLE RD over ST 2 EB

MM 81.9 ON ST 2 EB · County 027, Massachusetts · Built 1969 · 2 Lanes · 4,138 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
T0202419GDOTNBI
Year Built
1969
Length
28.6 m (93.8 ft)
Max Span
27.1 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
4,138
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$610,000
Total Project Cost
$916,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.