HWY DEPOT RD over RR GWRR

1.M S. JCT. ST 68 · County 027, Massachusetts · Built 1992 · 2 Lanes · 3,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
T020111AUDOT634
Year Built
1992
Length
53.6 m (175.9 ft)
Max Span
20 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
3,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,029,000
Total Project Cost
$4,544,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.