HWY HMLET MLL RD over WATER OTTER RIVER
1000 S OF ST 68 · County 027, Massachusetts · Built 1938 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.5935, -72.046961
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 88 years old.
Nearby Bridges
HWY MAIN ST over WATER OTTER RIVER
Built 1938
ST 68 GARDNER RD over WATER BR OTTER RIVER
Built 2002
HWY BRIDGE ST over WATER OTTER RIVER
Built 1937
HWY DEPOT RD over RR GWRR
Built 1992
ST 68 WEST ST over WATER BAILEY BROOK
Built 1939
US202 ELM ST over WATER OTTER RIVER
Built 1999
HWY BROOKSIDE DR over WATER DRAINAGE
Built 2004
HWY BRIDGE ST over RR GWRR
Built 2005
HWY BROOKSIDE DR over WATER WILDER BROOK
Built 2006
HWY LEO DRIVE over WATER WETLAND
Built 2006
Bridge Details
- Structure #
- T0200517RMUNNBI
- Year Built
- 1938
- Length
- 29 m (95.1 ft)
- Max Span
- 18.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,422,000
- Total Project Cost
- $2,134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.