HWY MAIN ST over WATER OTTER RIVER
.1 MI S OF JCT RTE 68 · County 027, Massachusetts · Built 1938 · 2 Lanes · 2,844 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
42.595767, -72.052383
This bridge is in worse condition than 92.7% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 88 years old.
Nearby Bridges
ST 68 GARDNER RD over WATER BR OTTER RIVER
Built 2002
HWY HMLET MLL RD over WATER OTTER RIVER
Built 1938
HWY DEPOT RD over RR GWRR
Built 1992
HWY BRIDGE ST over WATER OTTER RIVER
Built 1937
ST 68 WEST ST over WATER BAILEY BROOK
Built 1939
US202 ELM ST over WATER OTTER RIVER
Built 1999
HWY BRIDGE ST over RR GWRR
Built 2005
US202 WINCHNDON RD over RR GWRR
Built 1994
HWY BROOKSIDE DR over WATER DRAINAGE
Built 2004
HWY LEO DRIVE over WATER WETLAND
Built 2006
Bridge Details
- Structure #
- T0200416AMUNNBI
- Year Built
- 1938
- Length
- 24.8 m (81.4 ft)
- Max Span
- 8.5 m
- Width
- 13.9 m (45.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,844
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,256,000
- Total Project Cost
- $3,385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.