HWY BROOKSIDE DR over WATER DRAINAGE

0.4 MILES NORTH CLARK ST · County 027, Massachusetts · Built 2004 · 2 Lanes

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
G01064CG2MUNNBI
Year Built
2004
Length
11 m (36.1 ft)
Max Span
10.9 m
Width
12.8 m (42 ft)
Lanes
2
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$218,000
Total Project Cost
$328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.