ST 2 A/ST101 over ST 2 EB

AT EXIT 83 · County 027, Massachusetts · Built 1969 · 2 Lanes · 13,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
T0202618QDOTNBI
Year Built
1969
Length
30 m (98.4 ft)
Max Span
28.8 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
13,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,382,000
Total Project Cost
$5,074,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.