ST 2 WB over HWY AIRPORT RD
.25 MI E OF TEMPLETON TL · County 027, Massachusetts · Built 1969 · 2 Lanes · 11,213 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.559167, -72.016583
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 57 years old.
Nearby Bridges
ST 2 EB over HWY AIRPORT RD
Built 1969
ST 2 over WATER OTTER RIVER
Built 1969
ST 2 WB over ST 2 A/W BROADWAY
Built 1969
ST101 PARKER ST over WATER OTTER RIVER
Built 1963
ST 2 EB over ST 2 A/W BROADWAY
Built 1969
HWY MILL ST over WATER BAKER BROOK
Built 1938
HWY S MAIN ST over ST 2 WB
Built 1969
HWY S MAIN ST over ST 2 EB
Built 1969
HWY PLEASANT ST over RR BMRR
Built 1885
HWY N MAIN ST over WATER E TEMPLTN PND OTLT
Built 1938
Bridge Details
- Structure #
- G010421NPDOTNBI
- Year Built
- 1969
- Length
- 24 m (78.7 ft)
- Max Span
- 22.3 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 11,213
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,224,000
- Total Project Cost
- $3,337,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.