ST 2 over WATER OTTER RIVER

ROUTE 2 MM 85.32 · County 027, Massachusetts · Built 1969 · 4 Lanes · 23,526 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
G010491NNDOTNBI
Year Built
1969
Length
11.9 m (39 ft)
Max Span
2.7 m
Lanes
4
Daily Traffic
23,526
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,911,000
Total Project Cost
$5,867,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.