ST 2 EB over ST 68 SB/TIMPANY BLVD

1.5 MI W OF TEMPLETON TL · County 027, Massachusetts · Built 1961 · 2 Lanes · 18,730 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
G010361NKDOTNBI
Year Built
1961
Reconstructed
2011
Length
40.2 m (131.9 ft)
Max Span
16 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
18,730
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$256,000
Total Project Cost
$385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.