ST 2 WB over ST 68 NB/TIMPANY BLVD

.5 MI.EST.OF ST-2A · County 027, Massachusetts · Built 1961 · 2 Lanes · 18,730 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
G010351NGDOTNBI
Year Built
1961
Reconstructed
2011
Length
43.9 m (144 ft)
Max Span
18.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
18,730
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$413,000