HWY CROSS ST over RR BMRR SPUR

@ CORNER OF SHERMAN ST · County 027, Massachusetts · Built 1874 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G0101021XDOT634
Year Built
1874
Reconstructed
1981
Length
12.2 m (40 ft)
Max Span
9.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,030,000
Total Project Cost
$1,546,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.