ST 2 WB over RR PWRR

.3 MI. E. OF ST 68 · County 027, Massachusetts · Built 1961 · 3 Lanes · 11,015 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
G010341NEDOTNBI
Year Built
1961
Length
20.1 m (65.9 ft)
Max Span
18.3 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
11,015
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,977,000
Total Project Cost
$2,966,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.