ST 2 A/W BROADWAY over WATER BENT TRAVERS POND
.5 MI E OF ST-68 · County 027, Massachusetts · Built 1924 · 2 Lanes · 5,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.559292, -71.984311
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 102 years old.
Nearby Bridges
HWY TRAVERS ST over WATER TRAVERS POND INLET
Built 2011
HWY WINTER ST over WATER BAKER BROOK
Built 2012
HWY UNION ST over RR PWRR
Built 1908
ST 2 EB over HWY PEARSON BLVD SB
Built 1961
ST 2 WB over HWY PEARSON BLVD SB
Built 1961
ST 2 EB over RR PWRR
Built 1961
ST 2 EB over HWY PEARSON BLVD NB
Built 1961
HWY MILL ST over WATER BAKER BROOK
Built 1938
ST 2 WB over HWY PEARSON BLVD NB
Built 1961
ST 2 WB over RR PWRR
Built 1961
Bridge Details
- Structure #
- G010031KMDOTNBI
- Year Built
- 1924
- Reconstructed
- 1929
- Length
- 8.7 m (28.5 ft)
- Max Span
- 7.2 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 5,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $883,000
- Total Project Cost
- $1,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.