ST 2 WB over HWY PEARSON BLVD NB

.5 MI. E. OF ST-68 · County 027, Massachusetts · Built 1961 · 2 Lanes · 11,527 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
G010311NADOTNBI
Year Built
1961
Length
42.4 m (139.1 ft)
Max Span
18.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
11,527
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,741,000
Total Project Cost
$5,612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.