HWY MILL ST over WATER BAKER BROOK

AT SAWYER ST · County 027, Massachusetts · Built 1938 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
G010221FMMUNNBI
Year Built
1938
Reconstructed
2012
Length
11.3 m (37.1 ft)
Max Span
10.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$524,000
Total Project Cost
$787,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.