ST 2 over ST 32 PETERSHAM RD
MM 75.2 ON ST 2 · County 027, Massachusetts · Built 1956 · 2 Lanes · 1,491 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.570719, -72.201069
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
ST 2 over WATER LAKE ELLIS
Built 1954
HWY PLEASANT ST over US202 /ST2
Built 1954
US202 /ST2 over ST 2 A/STATE RD
Built 1959
ST 32 CHSTNT HL AV over RR GWRR
Built 1995
ST 2 A/MAIN ST over RR GWRR
Built 1938
ST 32 CHESNT HL AV over WATER MILLERS RIVER
Built 1850
HWY CRESCENT ST over WATER MILLERS RIVER
Built 2020
HWY CANAL ST over WATER MILL BROOK
Built 1993
HWY EXCHANGE ST over WATER MILLERS RIVER
Built 1939
HWY HIGHLAND AVE over US202 /ST2
Built 1959
Bridge Details
- Structure #
- A1503219MDOTNBI
- Year Built
- 1956
- Reconstructed
- 1983
- Length
- 36.6 m (120.1 ft)
- Max Span
- 34 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,491
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,676,000
- Total Project Cost
- $5,515,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.