ST 2 over ST 32 PETERSHAM RD

MM 75.2 ON ST 2 · County 027, Massachusetts · Built 1956 · 2 Lanes · 1,491 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
A1503219MDOTNBI
Year Built
1956
Reconstructed
1983
Length
36.6 m (120.1 ft)
Max Span
34 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
1,491
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,676,000
Total Project Cost
$5,515,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.