HWY CANAL ST over WATER MILL BROOK

BETWN RT2A&S.ATHOL RD · County 027, Massachusetts · Built 1993 · 2 Lanes · 259 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
A1504518FMUNNBI
Year Built
1993
Length
6.7 m (22 ft)
Max Span
3.1 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
259
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$407,000
Total Project Cost
$611,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.