HWY CENTRAL TNPK over ST146
1.1 MI SO OF BOSTON RD · County 027, Massachusetts · Built 1982 · 2 Lanes · 7,779 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.149458, -71.722414
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 44 years old.
Nearby Bridges
ST146 NB over HWY SMITH RD
Built 1982
ST146 SB over HWY SMITH RD
Built 1982
ST146 over WATER COLD SPRING BROOK
Built 1938
HWY BOSTON RD over WATER COLD SPRING BROOK
Built 1970
HWY PURGATORY RD over ST146
Built 1982
HWY DEPOT ST over WATER BLACKSTONE RIVER
Built 1957
HWY HANNAH DR over WATER UNNAMED STREAM
Built 2015
HWY BLACKSTNE ST over WATER BLACKSTONE RIVER
Built 2019
HWY PLEASANT ST over WATER BLACKSTONE CANAL
Built 1956
HWY DEPOT ST over RR PWRR
Built 2006
Bridge Details
- Structure #
- S3301420HDOTNBI
- Year Built
- 1982
- Length
- 55.5 m (182.1 ft)
- Max Span
- 27.1 m
- Width
- 16 m (52.5 ft)
- Lanes
- 2
- Daily Traffic
- 7,779
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,164,000
- Total Project Cost
- $1,747,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.