HWY CENTRAL TNPK over ST146

1.1 MI SO OF BOSTON RD · County 027, Massachusetts · Built 1982 · 2 Lanes · 7,779 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
S3301420HDOTNBI
Year Built
1982
Length
55.5 m (182.1 ft)
Max Span
27.1 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
7,779
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,164,000
Total Project Cost
$1,747,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.