ST146 SB over HWY SMITH RD

.5MI. S. OF CEN. TPK. · County 027, Massachusetts · Built 1982 · 2 Lanes · 22,016 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S330221MNDOTNBI
Year Built
1982
Length
25.3 m (83 ft)
Max Span
24.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
22,016
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,161,000
Total Project Cost
$3,242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.