HWY ARMORY ST over RR CSX (ABANDONED)

S JCT OF ALBANY ST. · County 013, Massachusetts · Built 1934 · 2 Lanes · 20,285 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S2402614MDOT634
Year Built
1934
Length
19.8 m (65 ft)
Max Span
18.7 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
20,285
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,974,000
Total Project Cost
$2,962,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.