HWY ARMORY ST over RR CSX

AT JCT ALBANY ST. · County 013, Massachusetts · Built 1934 · 3 Lanes · 35,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
S2401614JDOT634
Year Built
1934
Length
28.7 m (94.2 ft)
Max Span
27.6 m
Width
15.1 m (49.5 ft)
Lanes
3
Daily Traffic
35,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,401,000
Total Project Cost
$11,102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.