HWY ST JAMES AVE over RR CONRAIL (ABANDNED)

.1 M S JCT ALBANY ST. · County 013, Massachusetts · Built 1903 · 2 Lanes · 21,207 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
S2402814NDOT634
Year Built
1903
Reconstructed
1992
Length
15.7 m (51.5 ft)
Max Span
14.9 m
Width
20.1 m (65.9 ft)
Lanes
2
Daily Traffic
21,207
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,636,000
Total Project Cost
$5,455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.