I 291 /US20 over RR CSX SPUR

0.2 MI E OF ST JAMES AVE · County 013, Massachusetts · Built 1969 · 6 Lanes · 59,482 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S2407311FDOTNBI
Year Built
1969
Length
24 m (78.7 ft)
Max Span
21.6 m
Width
43 m (141.1 ft)
Lanes
6
Daily Traffic
59,482
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,396,000
Total Project Cost
$2,095,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.