HWY ROOSEVELT AV over RR CSX

0.7 MI SOUTH OF I-291 · County 013, Massachusetts · Built 2013 · 4 Lanes · 21,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S2409190GDOT634
Year Built
2013
Length
53.7 m (176.2 ft)
Max Span
21.9 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
21,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,553,000
Total Project Cost
$8,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.