HWY BRKSHRE AVE over RR CSX

.1 M S JCT COTTAGE ST. · County 013, Massachusetts · Built 1920 · 4 Lanes · 21,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S2401814LDOT634
Year Built
1920
Length
22.3 m (73.2 ft)
Max Span
20.1 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
21,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,151,000
Total Project Cost
$4,727,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.