HWY N BR PARKWY over WATER N BR MILL RIVER

.2 MI SW OF RTE 21 · County 013, Massachusetts · Built 1934 · 2 Lanes · 3,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S240920N6MUNNBI
Year Built
1934
Length
7.3 m (24 ft)
Max Span
6.1 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
3,750
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$816,000
Total Project Cost
$1,225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.