HWY SUNRISE TERR over WATER N BR MILL RIVER

150 E GRAYSON DR. · County 013, Massachusetts · Built 1934 · 2 Lanes · 8,017 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
S24095AHLMUNNBI
Year Built
1934
Length
7.3 m (24 ft)
Max Span
6.1 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
8,017
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$831,000
Total Project Cost
$1,247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.