HWY WEST ST over WATER CHICOPEE RIVER

.2 MI S OF RTE 90 · County 013, Massachusetts · Built 1939 · 2 Lanes · 13,750 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L160160M7MUNNBI
Year Built
1939
Reconstructed
1993
Length
57.3 m (188 ft)
Max Span
55.5 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
13,750
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,013,000
Total Project Cost
$4,520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.