HWY NEW LOMBARD over WATER FULLER BROOK
.5 MI E OF BURNETT RD · County 013, Massachusetts · Built 1956 · 2 Lanes · 2,328 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.164592, -72.534914
This bridge is in worse condition than 19.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
I 90 WB over I 90 EXIT 51 RAMPS
Built 1957
I 90 EB over I 90 EXIT 51 RAMPS
Built 1957
I 90 WB over I 291
Built 1957
I 90 EB over I 291
Built 1957
I 291 over HWY FULLER RD
Built 1957
I 291 over COMB CHICPE RIV & ST141
Built 1954
HWY TECHNOLGY DR over WATER CHICOPEE RIVER
Built 1991
US 20 PAGE BLVD over RR CSX SPURR
Built 1968
HWY WEST ST over WATER HIGHER BROOK
Built 1929
I 90 WB over HWY WEST ST
Built 1957
Bridge Details
- Structure #
- C130330L7MUNNBI
- Year Built
- 1956
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,328
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,061,000
- Total Project Cost
- $3,092,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.