I 291 over COMB CHICPE RIV & ST141
MM 5.0 ON I-291 · County 013, Massachusetts · Built 1954 · 4 Lanes · 49,485 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.157722, -72.548125
This bridge is in worse condition than 56.9% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 72 years old.
Nearby Bridges
HWY TECHNOLGY DR over WATER CHICOPEE RIVER
Built 1991
I 291 over HWY FULLER RD
Built 1957
I 90 EB over I 291
Built 1957
I 90 WB over I 291
Built 1957
I 90 EB over I 90 EXIT 51 RAMPS
Built 1957
I 90 WB over I 90 EXIT 51 RAMPS
Built 1957
ST141 E MAIN ST over WATER POOR BROOK
Built 1993
I 90 over WATER COOLEY BROOK
Built 1957
HWY NEW LOMBARD over WATER FULLER BROOK
Built 1956
I 291 /US20 over ST 20 A/PAGE BLVD
Built 1969
Bridge Details
- Structure #
- C13027113DOTNBI
- Year Built
- 1954
- Length
- 265.5 m (871.1 ft)
- Max Span
- 45.7 m
- Width
- 29.6 m (97.1 ft)
- Lanes
- 4
- Daily Traffic
- 49,485
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $51,116,000
- Total Project Cost
- $76,675,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.